GE Monogram ZV750SPSS Manuel d'utilisateur Page 15

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 56
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 14
31-10724-7 15
Installation Instructions
INSTALLATION – RECIRCULATING
2
INSTALL MOUNTING BRACKETS
The vent hood must be secured to rear support framing
or a wall stud.
With the template taped in place, use a punch to mark
all mounting screw locations.
Drill 1/8″ pilot holes at the 6 punched locations.
Remove the template.
Enlarge holes that did not enter studs to 3/8″ and tap
anchors for wall fasteners into the holes.
Drive screws into the fasteners to allow anchors to
expand against the wall material. Remove the screws
for final installation.
Secure the mounting brackets to the wall studs with
wood screws provided.
NOTE: Screws “A” and “B” are preassembled onto the
brackets. Do not remove these screws.
3
INSTALL THE HOOD
Place the hood on the brackets and slide left to right to
align with rectangular slots at the top.
Adjust the installation height by tightening or loosening
the screws “A” at the bottom of the brackets.
Align the hood lower mounting holes with pilot holes in
the wall.
Using two large washers (supplied), install wood
screws or wall-fastener screws, loosely, into lower
mounting holes. Do not tighten.
Level the hood by tightening or loosening the screws
“A” located on the bottom mounting brackets.
Tighten the lower mounting screws.
Tighten screws “B” located at the top of the mounting
bracket against the hood to adjust position. Do not
overtighten screws.
Screws “B” to adjust
hood against wall
Level and height
adjustment
screws “A”
Lower mounting
screws
Screws “B”
Screws “A”
Vue de la page 14
1 2 ... 10 11 12 13 14 15 16 17 18 19 20 ... 55 56

Commentaires sur ces manuels

Pas de commentaire